Within the scope of the project, 250.000 mt of drinking water line construction, 160.000 mt of sewer construction and highway crossing with 5.080 mt of horizontal drilling were carried out in İzmit Çayırova Atatürk and Özgürlük Neighborhoods.
You have to choose a communication method.